Sewer Connections
To get a sewer connected you need to complete a sewer connection application form.
Once approved, you will receive a letter of acceptance from us along with a list of Council-approved contractors that are able to carry out sewer connections on sewer mains up to 225mm in diameter. All financial arrangements for the works are then between you and the contractor.
The sewer connection has to be inspected by us before backfilling begins. Photos showing the connection and the property will be accepted from the contractor if the supervisor is unable to inspect it. An as built drawing is required at the completion of the work.
You will need to complete a sewer connection/disconnection form to get your sewer disconnected.