POSTPONED: Moa Flat RWS Planned water shutdown - 16 April 2025
The scheduled planned water shutdown for Moa Flat RWS has had to be postponed to Wednesday 16 April, 8am to 2.30pm.
Clutha District Council will be modifying pipes at the Water Treatment Plant to cater for the new reservoir on Wednesday 16 April 2025.
This requires a water shutdown between 8am and 2.30pm.
In the event of bad weather or other unforeseen circumstances, this work may be rescheduled.
We apologise for any inconvenience this may cause and thank you for your cooperation and understanding.
Should you experience any additional difficulties, please ring Council on 0800 801 350.
What you should do to be ready:
In preparation, please fill your own containers with water to ensure you have enough to meet your needs while the water is shutdown.
We’ll do everything we can to restore your water supply as soon as possible, but please be aware that if things do not go as anticipated, it is possible that your water may be off for longer. Please make sure you have enough water put aside in case this happens.
What to do once your water supply is restored:
It’s likely you won’t need to do anything, but sometimes water works can stir up sediment in the pipes or create air pockets in the pipes. If you notice that your water is discoloured or there is air in your pipes, please turn on one outside tap and run it until the water runs clear.
Download the Antenno App or subscribe for updates via text or email: www.cluthadc.govt.nz/subscribe-for-updates